Operation
4812161201_F.pdf
2018-04-17
Driving
Operating the roller
2
6
3
1
Figure. Instrument panel
1. Starter switch
2. Throttle control
3. Emergency stop
6. Forward/reverse lever
Under no circumstances is the machine to be
operated from the ground. The operator must be
seated inside the machine during all operation.
Under no circumstances is the machine to be
operated from the ground. The operator must be
seated inside the machine during all operation.
Make sure that the area in front of and behind the
roller is clear.
Make sure that the area in front of and behind the
roller is clear.
Release the parking brake and check that the parking
brake lamp goes off.
Turn the throttle control (2) in backward position.
Check that the steering is working correctly by turning
the steering wheel once to the right and once to the
left while the roller is stationary.
When compacting asphalt, remember to turn on the
sprinkler system (12).
41
Summary of Contents for CC1300C
Page 2: ......
Page 10: ...e 4812161201_F pdf 2018 04 17...
Page 14: ...Introduction 4812161201_F pdf 2018 04 17 4...
Page 22: ...Special instructions 4812161201_F pdf 2018 04 17 12...
Page 30: ...Technical specifications 4812161201_F pdf 2018 04 17 20...
Page 34: ...Machine description 4812161201_F pdf 2018 04 17 24...
Page 56: ...Operation 4812161201_F pdf 2018 04 17 46...
Page 68: ...Operating instructions Summary 4812161201_F pdf 2018 04 17 58...
Page 70: ...Preventive maintenance 4812161201_F pdf 2018 04 17 60...
Page 79: ...Maintenance Maintenance schedule 4812161201_F pdf 2018 04 17 Service Checklist 69...
Page 80: ...Maintenance Maintenance schedule 4812161201_F pdf 2018 04 17 70...
Page 104: ...Maintenance measures 500 h 4812161201_F pdf 2018 04 17 94...
Page 114: ...Maintenance 1000h 4812161201_F pdf 2018 04 17 104...
Page 128: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...