
Miscellaneous
4812160801_D.pdf
2018-12-17
Securing CC800/900/1000 for loading
Securing the CC800/900/1000 vibratory roller from
Dynapac for transport.
Direct of travel
Roller loaded in forward
direction
1 - 2
3 - 4
= double lashings, i.e. one lashing with two parts secured to two different lashing mounts,
symmetrically located on the right and left sides.
1 - 2
3 - 4
= double lashings, i.e. one lashing with two parts secured to two different lashing mounts,
symmetrically located on the right and left sides.
5
= rubber
5
= rubber
The lashings' permitted distance interval in meters
The lashings' permitted distance interval in meters
(1 - 4: Double lashings, LC at least 1.7 tonnes (1700 daN), S
TF
300 kg (300daN))
(1 - 4: Double lashings, LC at least 1.7 tonnes (1700 daN), S
TF
300 kg (300daN))
Double L
1
- L
2
Double L
3
- L
4
Double L
1
- L
2
Double L
3
- L
4
0,6 - 3,0
0,1 - 3,0
0,6 - 3,0
0,1 - 3,0
The distance
L
1
above is between points
D
and
E
.
D
is the projected point directly at right angles laterally in relation to
the edge of the platform from the lashing mount
C
on the roller.
E
is the lashing mount at the edge of the platform.
L
2
–
L
3
have a corresponding relationship.
The distance
L
1
above is between points
D
and
E
.
D
is the projected point directly at right angles laterally in relation to
the edge of the platform from the lashing mount
C
on the roller.
E
is the lashing mount at the edge of the platform.
L
2
–
L
3
have a corresponding relationship.
51
Summary of Contents for CC1000
Page 2: ......
Page 12: ...Introduction 4812160801_D pdf 2018 12 17 4 ...
Page 20: ...Special instructions 4812160801_D pdf 2018 12 17 12 ...
Page 28: ...Technical specifications 4812160801_D pdf 2018 12 17 20 ...
Page 54: ...Operation 4812160801_D pdf 2018 12 17 46 ...
Page 64: ...Operating instructions Summary 4812160801_D pdf 2018 12 17 56 ...
Page 66: ...Preventive maintenance 4812160801_D pdf 2018 12 17 58 ...
Page 70: ...Maintenance Lubricants and symbols 4812160801_D pdf 2018 12 17 62 ...
Page 77: ...Maintenance Maintenance schedule 4812160801_D pdf 2018 12 17 Service Checklist 69 ...
Page 78: ...Maintenance Maintenance schedule 4812160801_D pdf 2018 12 17 70 ...
Page 86: ...Maintenance 10h 4812160801_D pdf 2018 12 17 78 ...
Page 116: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...