Maintenance - Maintenance schedule
ICA134-3EN2.pdf
2012-04-13
General
Periodic maintenance should be carried out after the
number of hours specified. Use the daily, weekly etc.
periods where number of hours cannot be used.
Remove all dirt before filling, when checking
oils and fuel and when lubricating using oil or
grease.
Remove all dirt before filling, when checking
oils and fuel and when lubricating using oil or
grease.
The manufacturer’s instructions found in the
engine manual also apply.
The manufacturer’s instructions found in the
engine manual also apply.
Every 10 hours of operation (Daily)
Refer to the contents to find the page number of the
sections referred to !
Pos. in
fig
Action
Comment
Pos. in
fig
Action
Comment
Before starting up for the first time on that day
Before starting up for the first time on that day
1
Check for free circulation of cooling air
1
Check for free circulation of cooling air
30
Check coolant level
Refer to the engine manual
30
Check coolant level
Refer to the engine manual
2
Check the engine oil level
Refer to the engine manual
2
Check the engine oil level
Refer to the engine manual
28
Refuel
28
Refuel
6
Check fluid level in hydraulic reservoir
6
Check fluid level in hydraulic reservoir
Test the brakes
Test the brakes
After the FIRST 50 hours of operation
Refer to the contents to find the page number of the
sections referred to !
Pos. in fig
Action
Comment
Pos. in fig
Action
Comment
2
Change the engine oil and oil filter
Refer to the engine manual
2
Change the engine oil and oil filter
Refer to the engine manual
3
Change the fuel filter
Refer to the engine manual
3
Change the fuel filter
Refer to the engine manual
8
Change the hydraulic fluid filter
8
Change the hydraulic fluid filter
68
Summary of Contents for CA134
Page 2: ......
Page 12: ...Introduction ICA134 3EN2 pdf 2012 04 13 4 ...
Page 16: ...Safety when operating ICA134 3EN2 pdf 2012 04 13 8 ...
Page 18: ...Safety Optional ICA134 3EN2 pdf 2012 04 13 10 ...
Page 22: ...Special instructions ICA134 3EN2 pdf 2012 04 13 14 ...
Page 24: ...Technical specifications Noise Vibrations Electrical ICA134 3EN2 pdf 2012 04 13 16 ...
Page 28: ...Technical specifications Weights and volumes ICA134 3EN2 pdf 2012 04 13 20 ...
Page 30: ...Technical specifications Working capacity ICA134 3EN2 pdf 2012 04 13 22 ...
Page 34: ...Technical specifications General ICA134 3EN2 pdf 2012 04 13 26 ...
Page 40: ...Machine description Decals ICA134 3EN2 pdf 2012 04 13 32 ...
Page 54: ...Operation Vibration ICA134 3EN2 pdf 2012 04 13 46 ...
Page 58: ...Operating Stopping ICA134 3EN2 pdf 2012 04 13 50 ...
Page 66: ...Operating instructions Summary ICA134 3EN2 pdf 2012 04 13 58 ...
Page 68: ...Operating instructions Summary ICA134 3EN2 pdf 2012 04 13 60 ...
Page 70: ...Preventive maintenance ICA134 3EN2 pdf 2012 04 13 62 ...
Page 74: ...Maintenance Lubricants and symbols ICA134 3EN2 pdf 2012 04 13 66 ...
Page 92: ...Maintenance 250h ICA134 3EN2 pdf 2012 04 13 84 ...
Page 96: ...Maintenance 500h ICA134 3EN2 pdf 2012 04 13 88 ...
Page 102: ...Maintenance 1000h ICA134 3EN2 pdf 2012 04 13 94 ...
Page 105: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...
Page 106: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...