Figure 13
Figure 13a Figure 14
7. Installing the FRONT GLASS DOOR HANDLE
A.
Next, the inner and outer door handles need to be mounted to the FRONT
GLASS DOOR.
The natural finish side will be the interior door handle portion
and the one with the stain finish will be the exterior door handle portion. The
screws will be used to mount the door handle to the glass door.
8. Installing the ROOF PANEL
A.
The side of the ROOF PANEL with the ceiling vent will be situated towards the
rear of the sauna. Two adults can carefully lift the ROOF PANEL up and onto
the top of the sauna room. Be careful when setting the ROOF PANEL into place
as the cords and wire harness will need to be fed up to the topside of the ROOF
PANEL. (see Figure 15)
Figure 15
Page 17