ON/OFF AIRPORT - FEEDNECK
ON/OFF AIRPORT
The DM9 comes equipped with an ON/OFF Airport
attached to the bottom of the frame. To turn on the gas
supply, twist the ON/OFF knob clockwise, all the way in.
To turn off the gas supply, twist the ON/OFF knob
counterclockwise, all the way out. As you turn the knob
out, the residual gas between the Hyper3™ and the
ON/OFF airport is vented. To remove the airport from
the UL frame see page 13.
CAM LEVER FEED NECK
The Cam lever feed neck is adjustable to fit any
standard loader. To adjust the cam locking system turn
the thumb adjustment knob clockwise to tighten, or
counterclockwise to loosen. Press the cam lever down
against the feed collar to secure the loader in the feed
neck. To loosen the locking system and remove the
loader, lift the cam lever away from the feed collar.
Take care not to over tighten the cam locking system.
The cam lever should not be difficult to lower into the
locked position.
NOTE: Even with the air supply removed the marker may have gas
inside. Be sure to vent this gas. Make sure there are no paintballs
in the breech and dry fire the marker in a safe direction.
W
W
W
.
D
Y
E
P
A
I
N
T
B
A
L
L
.
C
O
M
W
W
W
.
D
Y
E
P
A
I
N
T
B
A
L
L
.
C
O
M
12
13
REMOVING ULTRALITE FRAME FROM THE DM9
If there is ever need to remove the Ultralite frame from the DM9 make sure to follow these steps.
• Remove three grip panel screws with a
3
⁄
32
" Allen wrench from the right side of Ultralite frame.
• Disconnect the solenoid wire and the eye wire from their sockets by gently pulling them out.
• Using a
3
⁄
32
" Allen wrench, turn the front frame screw counterclockwise one full turn.
• Finally, turn out the back frame screw and slide the frame back and down until it comes off the DM9.
To connect the frame follow above steps in reverse order.
INTEGRATED LOCKING DOVETAIL FEATURE
The Ultralite frame comes equipped with an integrated locking dovetail. There is a horizontal
locking screw located on the bottom right side of the Ultralite frame. It can be accessed with a
1
⁄
8
"
Allen wrench through a hole in the grip panel. To unlock a part attached to the dovetail of the frame,
turn the locking screw counterclockwise one full turn and slide part off the rail. To attach a part to
the rail, slide the part on and turn the locking screw clockwise until part is firmly locked in place.
NOTE: Be sure that the frame and trigger assembly are kept clean. If there is excess dirt or
paint build up around the trigger, the trigger will no longer move freely. In addition, paint and
dirt can cause the microswitch to not function properly or fail. Be sure you do not pinch the
wires between the frame and the body when reattaching the frame and body.
ULTRALITE FRAME
Summary of Contents for DM9
Page 1: ... ...