D9
16
Driving skills instruction:
the machine has strong power drive capability, the operator must be trained to operate.
Operate independently after handling the machine progress, back, turn, obstacle avoidance
and emergency stop.
driving rules: driving on the right, from the outside to inside, one by one
pressure into the gap.
The machine has automatic buffer start design, speed control knob in the
normal working area, can make the machine start smoothly. When the
machine starts, the operator should check the speed control knob in time.
When the speed control knob is in the high speed zone, it should be
adjusted in time to avoid possible danger!
it is strictly prohibited to run at high speed! when you pull over, you should
pay attention to the passing position of the suction truck. It is strictly
forbidden to pass through the obstacle, so that the operation will not only
cause unexpected accidents, but also cause damage to the water
absorption system!
in the new area before operation, to examine the working site, running the
line on the machine to advance planning, should not blindly follow the act,
to ensure the safety of operators and equipment and the safety of
surrounding objects!
Although the machine has a strong suction, but after all, is not sweeping
machine, in the operation, it is best to pre cleaning the work site, remove
particulate waste and debris, in order to improve cleaning efficiency and
effectiveness!
After cleaning if the floor surface with filamentous water marks, the reason
is the floor particles or hair under the rubber blade, it can be improved or
eliminated by site precleaning or staged cleaning!
this is ride on floor scrubber, fit for the width more than 1.5m space, for
safety, the machine should be run within the suitable area, don't pull over
or close to the equipment operation, to avoid accidents!
the height of the machine is 1.4 meters. Before the work is carried out, the
operator must confirm the safety of the work site in advance and make sure
the traffic height is high. It must be carried out before the safety is
confirmed.