D9
10
Squeegee
Please install the squeegee as shown in the right figure. Each
equipment has been adjusted to the best position before
leaving the factory. Please do not change the adjusting screw
on the squeegee, just insert the squeegee into the fixing screw
to fix it
After fixing the squeegee, connect the sewage suction pipe
with the squeegee port.
the rear rubber of squeegee should keep a right angle with
the floor. When moving forward, the rubber and the floor must
be bent evenly. If this requirement is not met, it will affect the
scraping effect.
brush loading and unloading
1. check the battery is in good connection.
2. turn the key to the ON position
3. brush system will automatically keep the brush stay in the
lifting position.
4. turn the key to the OFF position and remove it from the
instrument panel (to ensure that the machine does not have
anything to do) by manually putting the brush into the
machine.
Be careful:
rubber of squeegee in the transport process may appear
deformation because of extrusion, do not use any solvent or
hot air blowing process,
LINATEX
professional rubber has a
strong recovery elasticity, as long as lift the squeegee and
keep it overnight, it will be recovery.
Be careful
:
Turn over and put down the recovery tank must be pushed gently to ensure safety,
especially when putting down the recovery tank, you must hold the recovery tank to
ensure that the recovery tank is put down smoothly.
The squeegee and the machine are connected by
two fixed screws. When the machine passes
through the narrow area, the structure will fall off
automatically to prevent the impact damage, so as
to ensure the safety of each other.
In case of falling off, as long as the installation is resumed, it is
strictly prohibited to fix the squeegee and the machine in
mandatory way to fix.