MAKE WATER SUPPLY CONNECTIONS
• Connect HOT water supply to LEFT INLET UNION
(1)
and COLD water supply to RIGHT INLET UNION
(2)
.
Pipe connections are 3/4
"
(19 mm) NPT. Use sealant
or Teflon tape on pipe connections.
Do not solder directly to valve body.
TEST INSTALLED FAUCET
• Remove AERATOR from FAUCET.
• With HANDLES in OFF position, turn
on WATER SUPPLIES and check all
connections for leaks.
• Operate both HANDLES to flush water
lines thoroughly.
• Replace AERATOR.
• Lift HAND SHOWER from HOLDER,
direct spray into tub. Lift TRANSFER KNOB
to check HAND SHOWER and HOSES
for leaks.
• Turn handles “off” and replace HAND SHOWER.
INSTALL VALVE BODIES
• HANDLE ASSEMBLIES
(1, 1A)
are installed on VALVE BODIES
(2)
and must be removed to install VALVE BODIES
(2)
from under
tub deck or mounting surface.
• To remove HANDLE ASSEMBLY
(1)
, unthread HANDLE BASE
(3)
with LEVER
(4)
from VALVE BODY
(2)
. Pull HANDLE ASSEMBLY
(1)
off VALVE STEM
(5)
.
• Unthread and remove MOUNTING RING
(6)
and SPACER
(7)
.
• Thread LOCKNUT
(8)
to bottom of VALVE BODY
(2)
. Make sure
FIBER WASHER
(9)
and RUBBER WASHER
(10)
are installed.
Insert VALVE BODY
(2)
through mounting hole from underside
of tub deck or mounting surface.
NOTE: VALVE BODY marked Hot is installed in the left Mtg. hole,
VALVE BODY marked Cold in the right when facing front
of fitting Maximum mounting surface thickness is 1-1/2".
• From top install SPACER
(7)
onto VALVE BODY
(2)
. Thread
MOUNTING RING
(6)
on VALVE BODY
(2)
until seated tightly
against SPACER
(7)
. Set VALVE BODIES
(2)
so that their outlets
are facing toward SPOUT TEE
(11)
and then tighten LOCKNUT
(8)
using 35 mm or adjustable wrench.
• Insert RUBBER WASHERS
(12)
into COUPLING NUTS (
13)
of
SUPPLY HOSES
(14)
and tighten making water tight connection.
Important: Loop SUPPLY HOSES
(14)
as illustrated so they do not kink.
INSTALL HANDLES
• Turn VALVE BODIES
(2)
to off position. Align HANDLES as shown or as desired and install HANDLE ASSEMBLY
(1, 1A)
onto VALVE STEM
(5)
. Thread HANDLE BASE
(3)
onto VALVE BODY
(2)
until seated tightly against mounting surface.
1-1/2'' MAX.
"O" RING
6
1
3
4
8
12
HOT
13
14
9
11
10
7
5
2
"O" RING
TUB DECK OR
MOUNTING SURFACE
HOT
COLD
3/4" D.
IMPORTANT: It is strongly recommended that
access be provided for all enclosed mechanical
parts to this system.
3/4" X 3/4" NPT UNION
(NOT SUPPLIED)
HOT
COLD
3/4" NPT
TRANSFER KNOB
3/4" NPT
2
1
HAND
SHOWER