Assembly
5
Requirements
5.1
Installation/setup room
The room chosen for set up must fulfil the follow-
ing requirements:
– Closed, dry, well-ventilated room.
– Should not be a purpose-made room (e. g.
boiler room or wet room).
– Set up the unit on a clean, level and sufficiently
stable surface (take the weight of the unit into
account).
– Set up or install the unit so that the type plate
can be easily read and the unit is easily acces-
sible for operation and maintenance.
– Set up the units so that the socket to which
the units is connected is easily accessible.
– Room temperature: +5°C to +40°C.
– Ensure that there is sufficient distance to the
wall so that the air can flow in and out without
any obstruction.
The air is filtered when it is sucked in. This
does not alter the composition of the air.
The source of the air taken in should be
free of any harmful substances (e.g. do
not draw in air from an underground
garage or directly next to a suction
machine).
NOTICE
Risk of overheating due to insufficient
ventilation
The units generates heat. Possibility of
heat damage and/or reduced service life
of the unit.
❯
Do not cover the unit.
❯
Air must be able to flow in and out
unobstructed.
❯
Ventilation openings must be suffi-
ciently large.
❯
Installed units may require an inde-
pendent ventilation system in unfavour-
able cases.
The unit must only be operated on a stable, even
base. The unit must not be used as a climbing
aid. Danger of breakage! Place a collector tray
under the condensate drain (14) on the rear of
the unit to collect any condensate that is blown
out.
13
14
15
WARNING
Do not reach into the fan grille with
your fingers or any objects
Risk of injury from fan blades.
❯
5.2
Pressure vessel test
The owner must comply with the national
directives.
Example for Germany:
German Ordinance on
Industrial Safety and Health (BetrSichV)
Assembly
16
0715100100L02 2111V005
EN