Page
15
Dura
®
LIFESTYLE
LIFESTYLE
Whitford
1.7 Timber frame to base securement
2
Adjust the frame to get a 10mm overhang on all 4 sides. Then, make sure diagonal measurements as
shown are the same, to ensure frame is straight and square.
1
Only on the front wall, pre-drill 4 holes approximately 35mm from the outermost and innermost
studs through bottom plate and concrete base using hammer drill and 10mm masonry drill bit. Secure
4 “L” brackets to studs using two 25mm Tek Screws and to the bottom plate using M10 x 140 screw
bolts.
10
Pre-drill a hole within 50mm from one side of studs as shown, through timber and concrete base
using hammer drill and 12mm masonry drill bit (18 holes in total). Fasten timber frame to the base
through the holes using M12x135 through bolts.
3