background image

Step 3:

 

On the back of the left hand door, 
position  latch so that the hook on 
the door handle will be secure and 
go in and out easily. Rivet in place 
with four rivets.

 

Left Hand Door

 

Right Hand Door

 

Hook

 

Latch

 

14

 

MK4B BARGE & SPOUTING

 

Step 1:

 

Attach  left  hand  and  right  hand  barges  (C102  & 
D102)  together with three rivets at  top overlap. Posi-
tion Barge Flashings on gable ends. . Position Spout-
ing  on  the  shed  and  rivet  to  barge  Flashing  at  each 
end. Repeat with other Spouting.

 

Step 2:

 

Centralise  Barge  Flashing  on  gable  end 
and  rivet  in  place,  one  rivet  into  every 
second Rib. Fit  two rivets through top  of 
Barge  into Rib. Repeat  with other Barge 
Flashing.  Check  Spoutings  are  straight, 
then rivet to Roof one rivet every second 
Rib.

 

Step 1:  

Attach 

“ 

T

” 

locking handle with two 8x10mm 

screws TO R/H door (Door without the weather

-

strip). Slide hook onto square shaft and secure 
with a lock washer.

 

Step 2:

 

Once doors are hung, position the Locking 
Stays so they slide into the Locking Brackets 
easily. Screw Locking Stays to Door Jamb.

 

SECURITY DOOR (Optional)

 

Summary of Contents for MK4B

Page 1: ...Quality Built In ASSEMBLY INSTRUCTIONS MK4B BASE SIZE 4210mm x 3380mm ...

Page 2: ... checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools with care Use a Safety Trip Switch It is easier and quicker if this shed is erected by two people Your shed must be level Achieve this by either levelling the ground or by using blocks If you shed is t...

Page 3: ...ouch up Paint Brush Roof Sheets 0 580m 0 603 x 0 603m 0 588 x 0 150m 0 710 x 0 240m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Over Panel Window Hardware Pack 3 700m 1 850m 1 850m 1 175m 1 Roof Sheets Flat Roof Sheet Clear Roof Panel Ridge Flashing Clear Roof Hardware Pack Security Double Door Hardware Pack Alarm MA20 Shed light Bolt Down Kit Peg Down Kit KIWI MK4B PARTS LIST...

Page 4: ......

Page 5: ...ng two studs using 1 185m Nogs to get correct posi tion Position Nogs centrally between Plates and nail in place Step 3 End Wall Select one 3 380m Base Plate Green one 3 380m Top Plate Red three Studs Yellow and two 789m Nogs Lay out Plates and one Stud on a flat sur face and nail Stud centrally between Plates Nail remaining Studs to Plates using 789m Nogs to get the correct posi tion Position Nog...

Page 6: ...tud and skew nail in place using two 75mm nails each end Pre drilling holes before nailing will prevent timber from splitting Step 6 Place intermediate Roof Beams by using Roofing Nogs to determine correct position see fig 2 Nail intermediate Roof Beams in place Nail 70 x 45mm Roofing Nogs in place End Wall Step 7 Place Frame in correct position checking the shed is square and level Dynabolt Frame...

Page 7: ...Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be re positioned the nails can easily be prized out If a window is required identify Wall Sheet s with window hole pre cut Lean up Wall Sheets where window s are to be located Note When fitting Ga ble End Sheets ensure they over lap correctly fig 1 The overlap di rection m...

Page 8: ...te tack in place Repeat with remaining two sheets Step 4 Nailing Off Nail one 30mm Clout each side of the Rib two per Pan into the Top Plates and Bottom Plates Nail Wall Sheets to mid wall Nogs one per pan Nail each corner Wall Sheet to Studs using two 30mm Clouts evenly spaced Gable Ends When nailing Gable Wall Sheets to the Top Plate use a String Line At the top of the gable nail two 30mm Clouts...

Page 9: ...rill holes in each corner and nail Window Frame to framing using 50mm nails Step 4 If the Window is in the gable end tempo rarily position the Over Panel above Win dow Frame Following the same angle as the gable mark and cut to suit Step 5 Rivet Over Panel to the Window Frame with rivets 588mm Step 1 Lay out the two window studs 883mm and Nog 634mm on a flat surface Position Nog and nail in place ...

Page 10: ...ottom Plates and hard against Stud Attach Door Jamb Flashing with three rivets into Rib on the outside and three 30mm clouts into studs on the inside Repeat with the other Door Jamb Step 3 Fit Corner Flashing 101 over corner Ribs with the top flush with the top of the Top Plate Rivet in place with six rivets three each side Repeat with other three Corner Flashings When fitting Corner Flashings on ...

Page 11: ...ngs Also make sure the Wheels are cleaned of drill filings Re hang Doors Fit outer door stops Predrill a hole at each end of track into rib of cladding and screw outer door stops in using one Roofing screw per stop Fit inner door stops Predrill a hole 45mm each side of doorway centre and screw inner door stops in using one Roofing screw per stop Note adjust centre door stops left and right to ensu...

Page 12: ...he next Roof Sheet Ensure it overlaps correctly then rivet to gether one rivet in the centre and one 600mm and 1200mm down from the centre on both sides Fit remaining Roof Sheet Step 3 Centralize Roof at the other end and nail through Rib into the Ridge Beam and Top Plates using 50mm Clouts Ensure Ridge Beams are straight then Screw one 50mm Roofing Screw into Ridge Beam through each Rib on overla...

Page 13: ...rews Screw one 50mm roofing screw into ridge beam through each rib on overlap one screw per sheet Mould the soft edge on the flashing down into the pans of the roof sheet to prevent roof leaks Step 4 Continue to fasten roof sheets as per step 4 on previous page pg11 Note When screwing through the clear panel pre drill a 6mm hole TOP PLATE JACK STUD RIDGE BEAM 30mm CLOUT RIDGE FLASHING ROOFING SCRE...

Page 14: ...rge Flashing at each end Repeat with other Spouting Step 2 Centralise Barge Flashing on gable end and rivet in place one rivet into every second Rib Fit two rivets through top of Barge into Rib Repeat with other Barge Flashing Check Spoutings are straight then rivet to Roof one rivet every second Rib Step 1 Attach T locking handle with two 8x10mm screws TO R H door Door without the weather strip S...

Page 15: ...ase Plate This will stop water flowing in between the Base Plate and Floor The Floor should be made 15mm smaller than Base Size Note Although it is not essential fitting Damp Proof Course in between the Base Plate and the Floor will give added protection against moisture CLEAN UP Remove all swarf drill filings with a soft brush or rag Hose down roof and walls thoroughly For Coloursteel sheds use t...

Page 16: ...arried out in accordance with instructions below Should the cladding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the defective product The balance of the original warranty will cover any repaired or replaced material Riverlea Group Ltd will not be liable for any consequential loss or damage labour or transport charg...

Page 17: ......

Page 18: ......

Reviews: