Step 2:
Starting from the left hand end, centralize Roof on
Ridge Beam. Ensure Roof is tight against end Wall
Sheets, predrill then nail one 50mm Clout through
Rib into the Ridge Beam. At the back, line up Ribs
on the Roof Sheet with the Ribs on Wall Sheet.
Using one 50mm Clout, nail through Rib into Back
Top Plate. Repeat at the front.
Note The 10 x 50mm Clouts on end ribs are covered by the
Barge Flashings.
Step 1:
Position first Roof Sheet centrally over Ridge
Beam on the right hand end of shed with the LIP
on the left hand side. (For sheds with a Clear Roof
Panel, go to the next page). Position the next Roof
Sheet. Ensure it overlaps correctly then rivet to-
gether, one rivet in the centre and one 600mm and
1200mm down from the centre on both sides. Fit
remaining Roof Sheet.
Step 3:
Centralize Roof at the other end and nail through
Rib into the Ridge Beam and Top Plates, using
50mm Clouts. Ensure Ridge Beams are straight,
then Screw one 50mm Roofing Screw into Ridge
Beam through each Rib on overlap (one screw per
sheet per beam). At the back, set up a String Line
in centre of Top Plate. Ensure Top Plate is straight
and screw, using one 50mm Roofing Screw per
Rib. Repeat at the front.
50mm Clout
Roofing screws
12
MK4B ROOF
LIP
Note:
Condensation can form on the under side of shed roof. If building paper is required, fit now. Building paper will need to be sup-
ported by netting or roofing twine.