![Dunkirk GWB9-050IH-2 Installation Instructions Manual Download Page 6](http://html1.mh-extra.com/html/dunkirk/gwb9-050ih-2/gwb9-050ih-2_installation-instructions-manual_2539839006.webp)
6
Table 2 - 90 - 50/75/100 SERIES 2 NATURAL GAS
MODEL 90-50
Stock Factory
Btu Value of Natural Gas++
Settings
750
850
950
1000
1050
Altitude in Ft.
0-5,000
5,000-10,000
Normal Input (MBH)
50
–
–
–
–
–
Manifold Pressure In W.C.
2.5
4
4
3.5
2.5
2.5
Orifi ce
43331094
43331094
MODEL 90-75
Stock Factory
Btu Value of Natural Gas++
Settings
750
850
950
1000
1050
Altitude in Ft.
0-5,000
5,000-10,000
Normal Input (MBH)
75
–
–
–
–
–
Manifold Pressure In W.C.
2.5
3.5
3.5
2.5
2.5
2.5
Orifi ce
43331092
43331092
MODEL 90-100
Stock Factory
Btu Value of Natural Gas++
Settings
750
850
950
1000
1050
Altitude in Ft.
0-5,000
5,000-10,000
Normal Input (MBH)
100
–
–
–
–
–
Manifold Pressure In W.C.
2.5
3.5
3.5
2.5
2.5
2.5
Orifi ce
43331090
43331090
++Contact local gas utility or distributor for Btu value of gas.
BOILERS FOR USE AT HIGH ALTITUDE - UNITED STATES INSTALLATIONS
• Boilers (with exception of 90-75 propane (LP) product)
are factory equipped for operation at altitudes ranging
from 0-10,000 feet above sea level.
• No changes to factory settings are required for installa-
tions from 0-5,000 feet above sea level.
• For altitudes from 5,000-10,000 feet above sea level
gas manifold pressure needs to be adjusted based upon
calori
fi
c (Btu) value of supply gas (contact local gas
utility or distributor for this value).
• For speci
fi
c settings refer to Table 2 for natural gas
applications and Table 3, Page 7 for propane (LP) gas
applications.
• Instructions on how to adjust gas manifold pressure
settings see Figure 27 and Figure 28, Page 44 .
Note 90-75 propane (LP) applications for 5,000 - 10,000
feet above sea level require ori
fi
ce change as well as gas
manifold pressure adjustment based upon calori
fi
c (Btu)
value of supply gas.
Refer to Table 2 and Table 3 for high altitude ori
fi
ce part
number. For replacing ori
fi
ce refer to speci
fi
c instructions
included with conversion kit.
Summary of Contents for GWB9-050IH-2
Page 2: ...2 DIMENSIONS 2 2 Figure 1 Boiler Dimensions...
Page 12: ...12 NEAR BOILER PIPING Figure 2 Single Zone Boiler Piping...
Page 14: ...14 Figure 4 Two Zone Boiler Piping With Circulators NEAR BOILER PIPING...
Page 19: ...19 Figure 9 Diaphragm Type Expansion Tank Piping NEAR BOILER PIPING...
Page 20: ...20 Figure 10 Conventional Closed Type Expansion Tank Piping NEAR BOILER PIPING...
Page 24: ...24 Figure 12 Roof Vent Intake Terminations COMBUSTION AIR AND VENT PIPE VENT AIR INTAKE...
Page 32: ...32 Figure 21 Ladder Wiring Diagram ELECTRICAL WIRING...
Page 34: ...34 Figure 23 Ladder Diagram for Figure 22 ELECTRICAL WIRING...
Page 40: ...40 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Table 9 State Code Definitions...
Page 41: ...41 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Figure 26 Sequence of Operation...
Page 48: ...48 TROUBLESHOOTING Table 10 Error Codes...
Page 55: ...55 NOTES...