
26
Figure 15 - Concentric Vent Terminations
Combustion
Air
Vent
1" (2.54cm)
Maximum
Maintain 12"
clearance above
highest anticipated
snow level or grade
* See Note
Below
Vent
Combustion
Air
36"(0.9m) Minimum
Maintain 12"(30cm)
clearance above highest
anticipated snow level or
grade
12" (30cm) Minimum
*Must be less than 4" or greater than 24" Horizontal dis-
tance between end bells of each air intake to prevent
fl
ue
gas recirculation.
1" (2.54cm)
Maximum
Overhang
VENT
COMBUSTION AIR
COMBUSTION
AIR
1” MAXIMUM
NOTE:
SECURING STRAP MUST BE FIELD INSTALLED TO
PREVENT MOVEMENT OF TERMINATION KIT IN SIDE
WALL.
ELBOW
(FIELD SUPPLIED)
A
A
B
B
C
C
STRAP
(FIELD SUPPLIED)
VENT
Figure 16 - Concentric Vent
COMBUSTION AIR AND VENT PIPE
Figure 17 - Concentric Vent Roof
Installation
VEN
T
VEN
T
A
A
B
B
C
C
D
D
CO
M
AIR
CO
M
B
U
S
T
ION
AIR
ROOF
BOO
T/
FLASHING
(
FIELD
S
UPP
LIED
)
ELBOW
(
FIELD
S
UPP
LIED
)
S
UPP
OR
T
(
FIELD
S
UPP
LIED
)
M
AIN
T
ANIN
1
2
IN
.
(18
IN
.
FOR
CANADA
)
M
INI
MUM
CLEARANCE
ABOVE
HIGHES
T
AN
T
ICI
P
A
T
ED
SNOW
LEVEL
. M
A
X
I
MUM
OF
2
4
IN
.
ABOVE
ROOF
NO
T
E
:
S
UPP
OR
T MU
S
T
BE
FIELD
INS
T
ALLED
T
O
SEC
U
RE
T
ER
M
INA
T
ION
K
I
T T
O
S
T
R
U
C
TU
RE
.
Summary of Contents for GWB9-050IH-2
Page 2: ...2 DIMENSIONS 2 2 Figure 1 Boiler Dimensions...
Page 12: ...12 NEAR BOILER PIPING Figure 2 Single Zone Boiler Piping...
Page 14: ...14 Figure 4 Two Zone Boiler Piping With Circulators NEAR BOILER PIPING...
Page 19: ...19 Figure 9 Diaphragm Type Expansion Tank Piping NEAR BOILER PIPING...
Page 20: ...20 Figure 10 Conventional Closed Type Expansion Tank Piping NEAR BOILER PIPING...
Page 24: ...24 Figure 12 Roof Vent Intake Terminations COMBUSTION AIR AND VENT PIPE VENT AIR INTAKE...
Page 32: ...32 Figure 21 Ladder Wiring Diagram ELECTRICAL WIRING...
Page 34: ...34 Figure 23 Ladder Diagram for Figure 22 ELECTRICAL WIRING...
Page 40: ...40 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Table 9 State Code Definitions...
Page 41: ...41 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Figure 26 Sequence of Operation...
Page 48: ...48 TROUBLESHOOTING Table 10 Error Codes...
Page 55: ...55 NOTES...