![Dunkirk GWB9-050IH-2 Installation Instructions Manual Download Page 49](http://html1.mh-extra.com/html/dunkirk/gwb9-050ih-2/gwb9-050ih-2_installation-instructions-manual_2539839049.webp)
49
• Following steps and diagram indicate locations of
connection points required to check differential air
pressure.
• Differential air pressure switch is safety device which
prevents boiler from
fi
ring if there is air intake, boiler
heat exchanger or vent blockage.
• Turn off service switch, or lower thermostat setting.
• Remove vinyl caps from Tee and 4-way connector.
• Install testing lines as shown to inclined manometer or
differential pressure gauge with ability to read 0.01” to
3.0” w.c.
• Turn on service switch and set thermostat to call for
heat.
BOILER
STATUS
DIFFERENTIAL
PRESSURE (W.C.)
PRESSURE
SWITCH
CONNECTS
Not Running
0”
Normally Open
Setpoint
1.00” for Model-100
1.60” for Model-75
2.10” for Model-50
Running
Without
Blockage
Greater Than
Setpoints
Closed
Running
With
Blockage
Less Than or Equal to
Setpoints
Open
If manometer readings do not correspond to chart above,
check for possible causes:
• - Blockage or moisture in suction lines
• - Blockage in air intake or vent pipes
• - Undersized air intake or vent pipes
• - Loose blower wheel or motor shaft
• - Incorrect pressure switch or pressure switch setpoint
When pressure reading is proper and the pressure switch is
operating properly, remove testing lines and reinstall vinyl
caps to Tee and 4-way connector.
DIFFERENTIAL AIR PRESSURE SWITCH CHECK
Summary of Contents for GWB9-050IH-2
Page 2: ...2 DIMENSIONS 2 2 Figure 1 Boiler Dimensions...
Page 12: ...12 NEAR BOILER PIPING Figure 2 Single Zone Boiler Piping...
Page 14: ...14 Figure 4 Two Zone Boiler Piping With Circulators NEAR BOILER PIPING...
Page 19: ...19 Figure 9 Diaphragm Type Expansion Tank Piping NEAR BOILER PIPING...
Page 20: ...20 Figure 10 Conventional Closed Type Expansion Tank Piping NEAR BOILER PIPING...
Page 24: ...24 Figure 12 Roof Vent Intake Terminations COMBUSTION AIR AND VENT PIPE VENT AIR INTAKE...
Page 32: ...32 Figure 21 Ladder Wiring Diagram ELECTRICAL WIRING...
Page 34: ...34 Figure 23 Ladder Diagram for Figure 22 ELECTRICAL WIRING...
Page 40: ...40 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Table 9 State Code Definitions...
Page 41: ...41 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Figure 26 Sequence of Operation...
Page 48: ...48 TROUBLESHOOTING Table 10 Error Codes...
Page 55: ...55 NOTES...