ph: 519-923-9813 | [email protected]| web: www.dundalkleisurecraft.com
Fig 2a
Fig 2b
With a helper, place the front trim piece so the bottom of
the trim is ½” (13mm) above the top of the windows.
Ensure that the trim overhangs evenly on both sides of
the sauna.
(1 ½” ) (38mm)
12
Outdoor Pure Cube Sauna
Assembly Instructions
Repeat the same process with the side trim piece on
either side.
Place your EPDM membrane on top of the sauna.
Spread it out evenly over the entire roof.
Once the membrane is laid out evenly over the top of the
sauna, use staples or nails to secure it to the trim pieces.
Secure it every 6-8” (15-20cm)