![Ducasa AVANT-DGi+ 1000 Operating And Installation Instructions Download Page 7](http://html1.mh-extra.com/html/ducasa/avant-dgi-1000/avant-dgi-1000_operating-and-installation-instructions_2537521007.webp)
7
MODE
CONFIG.
PROG.
MODE
CONFIG.
PROG.
MODE
CONFIG.
PROG.
MODE
CONFIG.
PROG.
Mounting The Radiator
Place the radiator on the floor, as shown in Figure 1a. For radiators with 4, 6 and 8 elements position the
brackets supplied with the radiator between the first and second element (figure 1b). For radiators with more
than 9 elements, the bracket should be placed between the second and third element (figure 1b).
Fig. 1a
Fig. 1b
Fig. 2a
Fig. 3a
Fig. 2b
Fig. 3b
Place the supports between the elements as shown in Figure 2a, mark points on the walls through the fixing
holes as shown in Figure 2b. This determines the spacing of the supports. Fix the supports to the wall with
plugs and screws. Be sure that the supports are mounted in the correct position.
Lift the radiator and hang it on the supports, as Figures 3a and 3b.
Summary of Contents for AVANT-DGi+ 1000
Page 14: ...14 Installation Notes...