18
VENT TERMINAL, ROOF INSTALLATION
•
Here are the distance requirements for roof terminal installation.
•
Clearance between combustible wall and vent pipe must be 2" and a radiation shield must be
use to cross and insulated wall.
•
If vent terminal is more then 5 feet above the roof use roof braces to secure the whole
assembly
INSTALLATION OF SIDE PANELS AND PEDESTAL
•
Remove the three nuts on each side of the stove.
•
Place both panels in position and only screw the nuts back on manually.
•
Align the panels with the gold trim and tighten all nuts.
Summary of Contents for ULTRA FLAME
Page 16: ...16 L9001 TIF VENTING SYSTEM ...