![Drolet ULTRA FLAME Installation And Operating Instructions Manual Download Page 17](http://html1.mh-extra.com/html/drolet/ultra-flame/ultra-flame_installation-and-operating-instructions-manual_2532582017.webp)
17
VENT TERMINAL STRAIGHT OUT AND CORNER INSTALLATION
Seal with RTV silicone between 8" diameter pipe and radiation shield inside and outside the
building to prevent air passage. Install the vent terminal as shown. Insert the wall plate inside
the 8" pipe and screw it to the wall using the six #10 2-1/2" wood screws supplied. Place the 5"
locking band around the inner connector and insert the exhaust pipe. Sealing the joint with RTV
silicone. Secure the pipe in place with one #10 1/2" metal screw. Install the casing and secure
with metal screws provided. Install the cover by inserting the tab in the slot on the wall plate and
secure with metal screws.
Seal around the terminal to prevent any water from leaking into the house. Seal both ends of the
slot where the cover was inserted in wall plate with RTV silicone.
VENT TERMINAL, BASEMENT INSTALLATION
•
Seal with RTV silicone between 8" diameter pipe and radiation shield inside and outside the
building to prevent air passage.
•
Fix the 4" flexible, pipe with the locking band and with RTV silicone.
•
Fix the wall plate with 4 wood screws # 10 x 2-1\2" (supplied)
•
Seal around the terminal to prevent water leakage into the house
Summary of Contents for ULTRA FLAME
Page 16: ...16 L9001 TIF VENTING SYSTEM ...