HeatPack Furnace Installation and Operation Manual
24
7.3 Installation of the assembled plenum on the furnace
Step 1 :
Identify the right side of the plenum, it
is provided with holes for the installation of the
“RTD” thermal probe.
Also, 5 holes are aligned with the fold of the
top of the furnace on the right side and three
holes on the other sides. This allows you to
secure the plenum properly.
Step 2 :
Install the assembly on the
furnace, taking care to insert the 4 fold
on top of the furnace
inside
the
plenum.
Step 3 :
Using 14 black screws
(C)
#10 x 5/8", secure the plenum to the furnace.
Summary of Contents for HeatPack DF00500
Page 29: ...HeatPack Furnace Installation and Operation Manual 29...
Page 64: ...HeatPack Furnace Installation and Operation Manual 64 13 Exploded diagram and parts list...
Page 65: ...HeatPack Furnace Installation and Operation Manual 65...
Page 66: ...HeatPack Furnace Installation and Operation Manual 66...
Page 67: ...HeatPack Furnace Installation and Operation Manual 67...
Page 68: ...HeatPack Furnace Installation and Operation Manual 68...
Page 69: ...HeatPack Furnace Installation and Operation Manual 69...
Page 75: ...HeatPack Furnace Installation and Operation Manual 75 14 2 1 Technical data HeatPack...
Page 76: ...HeatPack Furnace Installation and Operation Manual 76...