Edison Installation and Operation Manual
24
4.5.4 Through a Factory Built Chimney
To make an installation through a factory
built chimney, run a 4" stainless steel liner
inside the factory built chimney.
1. Position stove following clearances
given
in
Section:
3.2
Minimum
Clearances to Combustibles and
following
vent
manufacturer’s
instructions.
2. Install a cleanout tee to the stove
exhaust. If necessary, use a horizontal
additional length between the exhaust
and the tee. If you wish to center the
vertical part of the vent with the stove, a
45° elbow and a tee can be used to
route the pipe from the exhaust towards
the back center of the stove.
3. Connect the pellet vent to the stainless
steel liner according to the vent
manufacturer’s instructions.
4. Seal and install vertical roof vent. If
required, seal and install a storm collar.
WARNING: IN THE U.S., THE USE OF A STAINLESS STEEL LINER IS MANDATORY.
IN CANADA, IT IS NOT MANDATORY BUT IS STRONGLY RECOMMENDED.
NOTE: VENTING DIRECTLY IN AN OVERSIZED CHIMNEY AND OMITTING THE USE
OF A STAINLESS STEEL LINER CAN AFFECT CHIMNEY DRAFT AND DECREASE
STOVE PERFORMANCES.
Summary of Contents for DP00065
Page 82: ...Edison Installation and Operation Manual 82 15 Replacement Parts ...
Page 83: ...Edison Installation and Operation Manual 83 ...
Page 84: ...Edison Installation and Operation Manual 84 ...
Page 85: ...Edison Installation and Operation Manual 85 ...
Page 86: ...Edison Installation and Operation Manual 86 ...
Page 87: ...Edison Installation and Operation Manual 87 ...
Page 88: ...Edison Installation and Operation Manual 88 ...