- 18 -
We recommend that the hot water distribution from the heater was as short as possible to minimise heat losses.
Heaters must be provided with a discharge valve mounted on the cold service water inlet to the heater for potential
disassembly or repair.
When assembling the security equipment, follow CSN 06 0830.
We recommend checking and cleaning the tank from scale and eventual replacement of the anode rod after two years
of operation. The anode life is theoretically calculated for two years of operation; however, it changes with water
hardness and chemical composition in the place of use.
Heat insulation
It is necessary to order the NEODUL isolation with 80 mm thickness
together with the tank.
It consists of an upper cover, flange cover and hole caps. Insulation
is supplied in a separate packaging.
We recommend that the insulation was fitted at room
temperature. At temperatures significantly below 20°C the
insulation shrinks. This disables its easy fitting.
Summary of Contents for NADO v1
Page 4: ...4 4 Zobrazen verz NADO a popis v vod...
Page 8: ...8 4 Przyk ad wersji NAD...
Page 12: ...12 4 Abbildung der Versionen NAD...
Page 16: ...16 4 Illustration of NADO versions...
Page 20: ...20 4 Az egyes NAD verzi k br i...
Page 24: ...24 4 NADO...
Page 25: ...25 5 6 0 3 90 C 0 6 90 C 2 3 1 110 C 0 3 5 45 C 80 06 0830 20 5...
Page 26: ...26 0 6 0 6 do 0 48 0 7 0 7 do 0 56 1 1 do 0 8 06 0830 NEODUL 100 20 C...
Page 28: ...28 4 Repr sentation des versions NADO et description des sorties...