background image

4

disinfection.
E: Illumination key: Press to start or stop the illumination.

Parameter specifications:

1. In the standard state, long press the SET button, the upper row on screen displays LK,
adjust LK=8, press the SET button to enter setting

2. Temperature parameter setting: In the standard state, long press the SET button, the

upper row on screen displays LK, adjust LK=3, press the SET button to enter the

temperature setting.

Symbol

Item

Value

Description

Factory set

value

KS

Power

on/Start

0

2

0: Stop state when power is on 1: Run from

the first stage when power is on; 2: Run from

the place where the power was last cut off

after power on.

0

md

Program

mode

0

1

0: Customized control; 1: Multi-segment

programming control.

0

tn

Timing

method

0

1

0:Start running timer, 1:when temperature

stable start timing (only fixed value)

1

Hn

Timing Unit

0

1

0:minutes

1:hour

0

Fn

High

and

low

fan

switch

0

100

Start the low-speed fan when the

temperature is between the( set value + Fn)

and (the set value-Fn); start the high-speed

fan when the temperature is outside (the set

value + Fn) to (the set value-Fn)

1

Ly

Lighting

delay

0

9999

The lighting lamp is turned on,it will

automatically turn off when the delay time is

not 0. when "Delay time is 0 ",the delay is

invalid, the lighting must be turned off

manually.

0

9999M/h

0

srt

Disinfection

delay

0

9999

The disinfection lamp is turned on, when

the delay time is not 0, it will automatically

turn off when the time is up. When delay time

is 0 , the delay is invalid, the lighting must be

turned off manually.

0

9999M/h

0

mon

Scheduled

boot

time

setting/

scheduled

boot month

setting

0

9999

Function one; the meter without Beijing time

will automatically turn on after mon minutes;

Function two; the instrument with Beijing

time, when Beijing time reaches the set time

(day, Hr, mTn) here, it will be turned on,

when Mon is greater than 12 ,the same as

function one.

0

Summary of Contents for DW-LBI Series

Page 1: ...gy Limited Chongqing Drawell Instrument Co Ltd Shanghai Drawell Scientific Instrument Co Ltd Chongqing Center Suite 2705 Building No 12 Shiyou Road No 1 Yuzhong District Chongqing China Shanghai Offic...

Page 2: ...I Application 1 III Technical Specifications 2 IV Installation requirements 2 V Operation Instruction 3 VI Wiring diagram 6 VII Malfunction handling 7 VIII Transportation and storage 7 IX After sales...

Page 3: ...he inside chamber can be cleaned regularly with dry cloth When the set temperature is lower than the room temperature the over temperature alarm will be generated if the door opening time is too long...

Page 4: ...be grounded The equipment shell should be grounded reliably and placed in a sheltered place from the sun cool and ventilated V Operation instruction Model DW LBI 80 DW LBI 150 DW LBI 200 DW LBI 250 D...

Page 5: ...always on for illumination flashing for UV disinfection 16 Heating indicator light on when heated 17 The refrigeration indicator lights when there is refrigeration output and flashes when refrigeratio...

Page 6: ...1 0 minutes 1 hour 0 Fn High and low fan switch 0 100 Start the low speed fan when the temperature is between the set value Fn and the set value Fn start the high speed fan when the temperature is out...

Page 7: ...ng integration time 1 3600S Integral action time constant the smaller the Iu the stronger the ability to correct the static error 240 d Heating differential time 0 3600S Differential action time const...

Page 8: ...value current measurement value current measurement value 0 cb Ambient temperature correction 60 100 0 cb actual ambient temp currently measured ambient temp 0 rl Temp lower limit setting 60 100 0 Th...

Page 9: ...e fan The meter is not corrected Correct the meter Note Maintenance operations shall be carried out by qualified personnel Please turn off the power supply before repairing VIII Transportation and sto...

Page 10: ...o change the data in the manual without prior notice The company has the final interpretation right 1 Biochemical incubator Machine 1 Set 2 User Manual Document 1 Copy 3 Fuse Spare parts 1pc 4 This pa...

Page 11: ...CO Ltd Add Suite 2705 Building No 12 Shiyou Road No 1 Yuzhong District Chongqing China Tel 0086 023 63268643 Shanghai Drawell Scientific Instrument Co Ltd Add Suite 1117 Lane561 XiuChuan Rd PuDong New...

Reviews: