D-1000B Heater
Operations & Maintenance
3.
STORAGE & TRANSPORT
3.1
Scope
The D-1000B heater is designed for
outdoor use only
. No special packaging is required for storage or transport.
3.1.1 Transport and Storage
IMPORTANT
The owner of the Heater is responsible for investigating local ordinances, applicable
laws, codes and regulations concerning the transportation of JP8 or Diesel fuel.
Before the D-1000B heater is transported or placed in storage, the heater
must
be totally cooled off. Before moving the
heater, the heater’s power switch must be in the OFF (0) position and unplugged. Ensure the following equipment is
installed and attached to the heater before transporting or storing.
Store the exhaust stack inside the fabric cover with straps which covers the heat outlet.
Protective (fabric) covers are placed on the air inlet and heat outlet area.
Repack and place the Accessory Bag with the Operator’s Manual and Remote Thermostat / CO Detector into the
accessory bag compartment, (see Figure 1-2).
Ensure the fuel cap is securely tightened.
3.2
Storage
3.2.1 Before storing
Always repack the accessory bag with the operators’ manual and remote thermostat / CO detector before storage. Place
the exhaust stack inside the fabric cover with straps and secure exhaust stack with straps. Reinstall all protective covers
and replace accessories bag into compartment in the base of the heater, (see Figure 1-2). Drain the fuel from the tank
using the following steps:
1.
Remove the four quick release pins.
2.
Remove the top cover.
3.
Carefully lift the heater up and remove the skid body.
4.
Using a suitable container, remove drain plug and drain fuel. (You may need to lift the opposite end from drain
plug to ensure all fuel is drained).
5.
Reinstall drain plug.
6.
Lift the heater and place back into the skid body.
7.
Reinstall top cover and four quick release pins.
3.2.2 After storing
1.
Remove all fabric covers and Accessories Bag from heater.
2.
Install exhaust stack.
3.
Add fuel; run the heater outdoors in accordance to the start up procedures for 10 minutes.
4.
Service heater if any problems are noted.
3.3
Shipping
Before shipping the D-1000B heater, ensure the power switch is in the OFF (0) position (the center position), the exhaust
stack is securely fastened inside the heat outlet fabric cover, the operators’ manual and remote thermostat / CO detector
are placed inside the Accessories Bag and placed in the base of the heater. Ensure all protective covers are in place.
This heater should be shipped in an enclosed box and securely fastened to a pallet.
STORAGE & TRANSPORT
3-1
DHS SYSTEMS LLC
No rights are conveyed except as indicated in the legend on the inside front cover of this document.