2
Preparation for Use
EPQ DataNode Series User’s Guide
2-21
DataNode 5510/5530: Connecting Power to the Input Pods
(New model Voltage and Current Pods shown)
Connection Type: 3 WIRE GROUNDED WYE, 3 ELEMENT DIRECT
Setup Mode: Wye
LOAD
A B C
Fuses
CT Shorting Switch
or Test Block
To Switchgear Chassis Ground*
Switchgear Chassis Ground**
Switchgear
Chassis Ground
Connections must be performed
in compliance with all safety
requirements applicable to your
installation.
*NOTE: Connections of CT
leg to ground is recommended,
but not required for proper
operation.
Refer to Fuse Warnings on page 2-12
**NOTE: Connections are the
same for 3 Wire Ungrounded
Wye, 3 Element Direct.