4.2.2 Pumping

(e.g. after overflowing from supply 

1

)

1

Press the green button 

= switch on the transfer

pump.

2

The green indicator light comes on.

The pump is protected against overheating (excessive
ambient temperature or insufficient supply pressure over
a long period). At a cylinder head temperature above
90°C the pump is switched off automatically and an indi
cator light in the red button (Stop) comes on.

In the event of leaks or other malfunctions, immediately
press the Emergency Stop button.

If necessary remove the power plug.

When the desired pressure has been attained:

3

Press the red button = switch off the transfer pump. At
a filling end pressure of 220 bar, the transfer pump is
automatically switched off.

4

When filling is complete, close the 200 bar filler valve.

4.0

OPERATION

4.2.2 Перекачивание

(например, после перепуска из накопительного балло
на 

1

)

1

Нажмите зеленую кнопку 

= включить перекачи

вающий насос.

2

Включается зеленая индикаторная лампа.

Насос защищен от перегрева (вследствие чрезмерной
температуры окружающей среды или недостаточного
питающего давления в течение длительного периода
времени). При температуре головки цилиндра выше
90 °C насос автоматически выключается и загорается
красная кнопка (Останов).

При возникновении утечек или других неисправностей
немедленно нажмите кнопку аварийного останова.

При необходимости выньте вилку электропитания.

Когда будет достигнуто желательное давление:

3

Нажмите красную кнопку = выключите перекачи
вающий насос. При конечном давлении наполнения
220 бар перекачивающий насос автоматически вы
ключается.

4

Когда заправка завершена, закройте наполнитель
ный вентиль 200 бар.

4.2.3 Окончание процесса заправки

1

Закройте вентили на заправленных кислородных
баллонах.

2

Откройте предохранительный клапан  200 бар,  пока
не стравится давление – затем снова закройте.

3

Свинтите заправленные кислородные баллоны с на
полнительных соединителей и немедленно заглушите
наполнительные порты и вентили баллонов.

4

Закройте впускной вентиль 

V1

.

4.0

ЭКСПЛУАТАЦИЯ

4.2.3 Ending the filling process

1

Close the valves of the filled oxygen cylinders.

2

Open the 200 bar relief valve until the pressure is re
leased – then close again.

3

Unscrew the filled oxygen cylinders from the filler con
nection and immediately seal the filler ports and cylin
der valves.

4

Close supply valve 

V1

.

4.3 Combination of overflow and pumping

(Perform as specified below, if all supply cylinders are
first filled with 200 bar)

1

Overflow from supply 

1

2

Pump from supply 

until the filling end pressure is 220

bar.

4.3

Комбинация перепуска и перекачивания

(Выполняется, как указано ниже, если все баллоны для
хранения кислорода исходно заправлены до 200 бар)

1

Перепуск из накопительного баллона 

1

2

Перекачивание из накопительного баллона 

1

, пока

не будет достигнуто конечное давление наполне
ния  220 бар.

Если давление в накопительном баллоне 1 падает
ниже 110 бар:

1

Перепуск из накопительного баллона 

1

2

Перекачивание из накопительного баллона 

1

, пока не

будет достигнуто давление наполнения 110 бар.

3

Перепуск из накопительного баллона 

2

4

Перекачивание из накопительного баллона 

2

, пока

не будет достигнуто конечное давление наполне
ния  220 бар.

Если после операций заправки давление падает
до 55 бар в накопительном баллоне 1 и до 110 бар
в накопительном баллоне 2:

1

Перепуск из накопительного баллона 

1

2

Перепуск из накопительного баллона 

2

3

Перекачивание из накопительного баллона 

до

давления 220 бар.

If the pressure in supply 1 falls below 110 bar:

1

Overflow from supply 

1

2

Pump from the supply 

until the pressure reaches 110

bar.

3

Overflow from supply 

2

4

Pump from supply 

until the filling end pressure is 220

bar.

If the pressure falls to 55 bar in supply 1 and to 110
bar in supply 2 after further filling operations:

1

Overflow from supply 

1

2

Overflow from supply 

2

3

Pump from supply 

up to a pressure 220 bar.

Summary of Contents for 65 26 802

Page 1: ...1 D 00121427 Dr ger Oxygen Booster DOB M DOB T High pressure oxygen transfer pump Instructions for Use...

Page 2: ...g operation 13 5 0 MAINTENANCE AND SERVICING 14 5 1 Servicing intervals 14 5 2 Maintenance and repairs 15 5 2 1 Check the safety valves drive components 15 5 2 2 Replacing the piston seals checking th...

Page 3: ...f explosion hazard The device is not authorised for use in explosion hazard areas The following legislative provisions must be observed z Pressurised Container Order dated May 1989 15 21 26 27 28 30 3...

Page 4: ...200 PN 300 10 4 1 PN 200 3 1 PN 300 50 PN 200 100 PN 300 200 DIN 477 G 3 4 300 Dr ger Oxy SR 400 50 440 60 3 x 230 50 60 High pressure oxygen transfer pump DR GER OXYGEN BOOSTER DOB M DOB T For trans...

Page 5: ...ct the transfer pump from impurities and clean it when necessary Do not cover the ventilation slots at the front and rear with notice plates or similar parts Make sure that the moving parts of the pum...

Page 6: ...lation airflow must be channelled from the front of the pump to the rear 3 0 INSTALLATION AND START UP 3 3 CEE 3 4 1 2 3 4 3 5 100 3 0 3 4 Preparing the device for operation 1 Connect the power plug t...

Page 7: ...0 bar to the filler ter minal 1 Open any valve of the supply cylinder 2 Close overflow valve VO 3 Press the green button G switch on the transfer pump The green indicator LED lights up the pump is com...

Page 8: ...intenance and repair operations Apply maximum pressure to the system Open all valves except pressure relief valve s VR Close supply valve s Open one pressure relief valve and close it carefully when t...

Page 9: ...ing areas the particular dangers of handling compressed gases and oxygen the applicable safety regulations the action to be taken in the event of faults damage and accidents the handling of fire extin...

Page 10: ...rder to make the fullest possible use of the oxygen supply and to avoid an excessive pressure difference when pumping i e increased pumping workload the transfer filling process consists of a combinat...

Page 11: ...4 V1 4 0 4 2 3 Ending the filling process 1 Close the valves of the filled oxygen cylinders 2 Open the 200 bar relief valve until the pressure is re leased then close again 3 Unscrew the filled oxygen...

Page 12: ...supply 1 has fallen to 10 bar supply 2 has fallen to 55 bar 4 0 OPERATION 1 10 2 55 1 10 200 2 2 1 10 2 10 200 140 7 4 2 200 10 2 4 0 When the pressure in supply 1 has fallen to 10 bar Never empty sup...

Page 13: ...to flow back as far as possible into the sup ply cylinders 2 Open the pressure relief valve until the pressure in the transfer pump has dropped to about 10 bar All pressure gauges indicate the same pr...

Page 14: ...actions are due Servicing must only be carried out by suitably trained ex perts We recommend that you take out a service contract with Dr gerService If not listed in the maintenance and repair operati...

Page 15: ...AND SERVICING 100 200 20 200 6 TRG 402 9 2 01 82 DBA Dr ger 12 1000 5 Dr gerService 5 2 5 2 1 25 1 150 2 200 220 5 300 330 5 3 90 25 14 5 0 5 2 Maintenance and repairs 5 2 1 Check the safety valves d...

Page 16: ...the 4 cylinder head bolts a f 11 or 7 16 per cylinder head 4 Carefully remove the cylinder head by hand and place it on a clean surface with the piston seal facing up wards 5 Remove the piston seal 1...

Page 17: ...ead using the previously re moved pressure piece 11 Check the piston play in the guide sleeve To this end fully remove the pistons on each side of the pump while firmly holding the guide sleeve 2 seri...

Page 18: ...k coloration If necessary replace the strainer inserts Order number D 02 316 spare part must be ordered 3 Check the condition of the seals and replace if neces sary For 200 and 150 bar filler ports G...

Page 19: ...19 50 DOB 200 100 DOB 300 40 C 5 3 Dr gerService 5 0 5 0 MAINTENANCE AND SERVICING...

Page 20: ...than 40 C Intake or pressure valve is sticking or worn Careful tapping with a hammer on the relevant valve housing generally frees the sticking valve balls If not Release the pressure from the pump R...

Page 21: ...x 3 m Power plug CEE shrouded male connector 16 A 5 pin 400 V Motor 3 phase motor Rated power 1 1 kW Rated speed 1500 rpm Drive type Toothed belt Drive speed pump approx 600 rpm fan approx 2400 rpm Pu...

Page 22: ...FLOW NL min INLET PRESSURE bar 300 Pump capacity at 300 bar filling end pressure 2 100 620 37 2 3 At 100 bar entrance pressure becomes a flooding service of Reached in 620 NL min 37 2 m 3 h overflow c...

Page 23: ...23 6 2 DOB 200 DOB 300 3x230 400 N PE 50 6 2 Electrical wiring diagram DOB 200 DOB 300 3x230 V 400 V N PE 50 Hz Standard version 6 0 TECHNICAL DATA 6 0...

Page 24: ...24 6 0 6 0 TECHNICAL DATA 6 3 Piping circuit diagram DOB M DOB T standard version 6 3 DOB M DOB T...

Page 25: ...raeger Oxy SR on request Accessories High pressure hose Connecting hose between 200 bar sup ply cylinder and transfer pump Max operating pressure 220 bar 1 5 m long U 02 451 High pressure hose GA oxyg...

Page 26: ...W 21 8 x 1 14 U 03 897 Filler hose GA oxygen outside Germany As per filler hose U 03 538 but Filler port connector W 21 8 x 1 14 internal manual connection Device cylinder connector W 21 8 x 1 14 int...

Page 27: ...27...

Page 28: ...use with any specific machine or device z y x FAX Dr ger Safety AG Co KGaA Germany Revalstra e 1 D 23560 L beck 49 451 8 82 0 26 80 70 49 451 8 82 20 80 http www draeger com z y x FAX Dr ger Safety A...

Reviews: