CONTACT US AT
www.DRpower.com
9
Common Parts (Figure 4 and list below)
- Shredder Hopper
- Chipper Chute
- Collection Bag
- Shredder Guard & Bracket Assembly
- Chipper Guard & Bracket Assembly
- Discharge Deflector
Assembly
Tools needed:
1/2" Wrench
5/32" Allen Wrench
7/16" Wrench
3/8" Wrench
2 X 4 Block (Electric Start Model)
Attaching the Shredder Hopper and Hammermill Housing
The Electric Start Power Unit does not come with the Leg installed. Therefore, a
2 X 4 Block will need to be positioned under the flange of the Flywheel Housing
to hold it upright (
Figure 5
). The Manual Start Power Unit can be positioned
upright onto the preinstalled Leg.
1.
Remove the two shipping nuts that are temporarily securing the
Hammermill Housing to the Power Unit using a 1/2" Wrench (
Figure 6
).
Discard the nuts.
2.
Position the larger end of the Shredder Hopper on a flat surface and set the
Hammermill Housing over the Shredder Hopper (
Figure 7
). Secure with
four 1/4-20 Button Head Screws on the inside and 1/4-20 Locknuts on the
outside using a 5/32" Allen Wrench for the Screws and 7/16" Wrench for
the Locknuts.
Note:
Make sure the Locknuts installed in step 2 are on the outside and the Button
Head Screws on the inside.
Adjust the Shredder Hopper and Hammermill Housing as you tighten the
hardware to make sure the back side of the Hopper is flush to the flange of
the Housing.
2 X 4 Block
Figure 5
Flywheel
Housing
Hammermill
Housing
Figure 7
1/4-20 Button
Head Screws
and Locknuts
Shredder
Hopper
Flange
Hammermill
Housing
Figure 6
Shipping
Nuts
Chipper Chute
Figure 4
Shredder
Hopper
Discharge
Deflector
Shredder
Guard and
Bracket
Assembly
Chipper Chute Guard
and Bracket Assembly
Collection
Bag