A-15
OPERATION OF THE PROOFER
1. Switch "ON" (1).
2. Set the thermostat control at 100
°
F.
3.
Set the humidity control at approximately:
3 for JAOP-3 & JAOP-6
4 or 5 for JAOP-10
5 for JAOP-14
4.
If there is too much fog and water drips from the glass doors,
adjust humidity control to a lower number.
5. When the temperature is stabilised, put the products in the proofer.
(Leave them inside until they are ready to bake.)
6.
IMPORTANT:
When proofing cycle is completed, turn the
humidity switch to "OFF" and let the motor blower and air heat
element run for 10-15 minutes to let dry the proofer. Then, turn the
main switch ‘’OFF’’ (0) and leave the door ajar to prevent moulding.
When the proofer is not in operation, open the doors to let out the humidity and to prevent
mould.
P.S.
The doors should not be opened unnecessarily to conserve the heat and humidity in the proofer.
Every day cleaning of the water pan under the proofer's doors should be exercised.
POWER FAILURE
When the power comes back, the proofer will start automatically. Then it’s recommended to turn OFF
the unit to avoid it starting without supervision.
Summary of Contents for JA8G
Page 44: ...B 1 SECTION B COMPONENT PARTS PIÈCES COMPOSANTE JAOP8G FRONT VIEW JAOP8G VUE DE FACE B 1 ...
Page 46: ...B 3 JAOP8G RIGHT SIDE VIEW JAOP8G VUE DE CÔTÉ DROIT B 3 ...
Page 48: ...B 5 JAOP8G BACK VIEW JAOP8G VUE ARRIÈRE B 5 ...
Page 50: ...C 1 SECTION C CONTROL PANELS PANNEAUX DE CONTRÔLE 1PH 120V WITH ZELIO 1PH 120V AVEC ZELIO C 1 ...
Page 51: ...C 2 1PH 120V WITHOUT ZELIO 1PH 120V SANS ZELIO C 2 ...
Page 52: ...C 3 120 208 240V 1PH WITH ZELIO SIMPLE 120 208 240V 1PH AVEC ZELIO SIMPLE C 3 ...
Page 53: ...C 4 120 208 240V 1PH WITHOUT ZELIO SIMPLE 120 208 240V 1PH SANS ZELIO SIMPLE C 4 ...
Page 54: ...SECTION D BURNER ADJUSTEMENTS AJUSTEMENT DU BRÛLEUR NATURAL GAS GAZ NATUREL D 1 ...
Page 55: ...PROPANE GAS GAZ PROPANE D 2 ...
Page 56: ......
Page 57: ......
Page 58: ...NOTES ...