51
ED250
08-2018
DL4614-070
dormakaba ED250 IG Installation Instructions
Chapter 16
16.14.1 Install 115 Vac power cable, case
to case.
1. Install 115 Vac power cable (Fig. 16.14.2)
from cement case with 115 Vac power
wiring to other case.
2. Connect cable to socket on each power
connection board (Fig. 16.14.2).
Fig. 16.14.1 Double door 115 Vac power cable case to case connection
1
115 Vac power
connection board
1
PVC pipe
2
PVC reducer
coupling
16.12 Double doors, install PVC reducer fittings and PVC pipe
Fig. 16.12.1 Double door electrical
installation kit
16.12.1 Install PVC reducer fittings and
PVC pipe.
1. Install PVC reducer fittings and PVC pipe
between the cement cases. Also install
any required tee fittings (by others) in
PVC pipe.
Fig. 16.13.1 Accessory wiring terminal block
2
Accessory wiring
terminal block
3
Power off/on switch
5
115 Vac liquidtight
fitting
6
PVC reducer fitting
2 3
6
5
16.13 Double doors, route accessory wiring into cement cases
16.13.1 Route accessory wiring into
cement case.
1. Route accessory wiring into cement
cases through PVC pipe and reducer
fittings and any additional accessory
wiring liquidtight conduits and fittings.
TIPS AND RECOMMENDATIONS
It is recommended not to
terminate accessory wiring at
accessory wiring terminal boards
until after ED250s have been
commissioned (Para. 21).
Reference Chapter 23.
CAUTION
PVC couplings and PVC pipe
installation should be done by
qualified personnel.
CAUTION
Seal PVC reducer couplings both
inside and outside of cement case
2 3/8" holes with Permatex No. 2
sealant.
16.12.2 Additional liquidtight conduit and
fittings for accessory wiring.
1. Install any additional liquidtight conduit
and fittings into cement cases that are
required for accessory wiring.
1
115 Vac power
connection board
2
Power off/on switch
3
Socket for 115 Vac
power connection
cable
4
ED250
115 Vac power
cable ,11'
DX3484-030,
2
1
3
3
16.14 Double doors, install case to case 115 Vac cable
Fig. 16.14.2 Power connection board and
115 Vac power cable
4
2
2
1