56
ED250
08-2018
DL4614-070
dormakaba ED250 IG Installation Instructions
Chapter 16
16.18 Hang door
1
Threshold
2
Door pivot hardware
(by others)
3
Door frame pivot
hardware (by others)
4
Offset pivot arm
5
Center hung arm
Note
Door and frame shown
transparent for
hardware views.
Fig. 16.18.1 LH offset pivot door
Fig. 16.18.2 LH center hung door
Fig. 16.18.3 LH slide arm and track door
1
Threshold
2
Butt hinge
3
Arm
4
Track
Note
Door and frame shown
transparent for
hardware views.
16.18.1 Door with pivot arm or center
hung arm.
WARNING
Hand pinch point and crushing
hazards!
TIPS AND RECOMMENDATIONS
Figures 16.18.1, 2 and 3 are
shown as examples.
1. Tools; set of pry bars recommended.
2. Spindle rotated to 70 degrees (Para.
16.15.3).
3. Install arm on door bottom.
4. Hang door.
5. Fasten arm to spindle.
6. Insure door is parallel to jamb.
16.18.2 Double doors
1. Hang each door per Para. 16.18.1.
16.18.3 Door with track, installing door.
1. Mount arm to track slide in door using
M8 shoulder screw. Using torque wrench
with 5 mm hex key, torque screw to
12 ft-lb.
2. Insert arm slot into spindle as door is
being installed.
3. Fasten arm to spindle.
4. Insure door is parallel to jamb.
16.14.4 Door threshold
TIPS AND RECOMMENDATIONS
It is recommended to place door
threshold over blockout and
cement case to check door
clearance before proceeding.
1
2
3
4
1
5
2
3
1
2
3
4
Fig. 16.18.5 Arm and track assembly
1
Track
2
Slide
3
Arm
4
M8 shoulder screw
1
2
3
4
1
2
4
3
Fig. 16.18.4 Mounting track arm to spindle
1
Track
2
Arm
3
Spindle
4
Shoulder screw