5
ED250
08-2018
DL4614-070
dormakaba ED250 IG Installation Instructions
Table of Contents
16.1 Verify concrete floor blockout
16.2 Install cement case, single door
16.3 Install cement cases, double door
16.4 Locate center of cement case spindle
16.5 Reinstall cement case cover
16.6 Anchoring cement pour in blockout around
bottom one inch of cement case
16.7 Remove cement case cover.
16.8 Single door, install and terminate 115 Vac
liquidtight conduit and wiring
16.9 Double doors, install and terminate
115 Vac liquidtight conduit and wiring
16.10 Single door, install PVC reducer fitting
16.11 Single door, route accessory wiring into
16.12 Double doors, install PVC reducer fittings
16.13 Double doors, route accessory wiring into
16.14 Double doors, install case to case 115 Vac
16.15 Rotate cement case spindle to enable
16.15.1 Set braking circuit plug position
16.15.2 Set AS installation type parameter
16.15.3 Initiate learning cycle to rotate spindle
16.16 Set operator spring tension
16.17 Install program switch panel
Install RJ45 plate assembly (double doors
only) 55
16.19 Reinstall cement case cover
16.20 Final anchoring cement pour
16.21 Remove cement case cover for ED250
16.22 Cement case chain tension
16.23 Cement case spindle height adjustment
Measure door width, set reveal depth
18.1 Reveal depth parameter rd
19.1 Set power fail closing speed
Single door first commissioning
21.2 Set configuration parameter
21.3 Verify driving parameters for low energy
Double door first commissioning
22.1 Separately commission active and passive
22.2 Set operator parameters for double door
22.3 Connect communication cable between
23.1 Connect accessory wiring, single door
23.2 Connect accessory wiring, double doors
24.1 A156.19 Low energy power operated
25.1 Install cement case cover