113
7.6.3
End Effector I/O Testing
To test the operation status of the connected end effector, follow the procedure below.
1
Select the end effector to test and tap the
Edit
button.
2
Tap the
On/Off
button of the
Signal
to test the output signal.
3
Select a function among the Workcell Item Actions and tap the Test button to test the end effector
function.
4
Check whether the end effector receiving the output signal operates normally.
Note
If the input signal is entered properly, a green indicator lights up.
Summary of Contents for A0509
Page 1: ......
Page 214: ...Doosan Robotics User Manual v2 6 1 214 ...
Page 251: ...251 ...
Page 252: ...Doosan Robotics User Manual v2 6 1 252 ...
Page 253: ...253 ...