9150-065-M-5-18
13
1.5 Underground Conduit Requirements
•
Operator’s setup is the same as the front
position or rear position with concrete pad
shown on page 10 and 11.
(Front upside down position shown here).
•
Junction box connection is used for the
ceiling mount installation.
Front or Rear Position Upside Down
Can be mounted on the ceiling to conserve floor space.
Note: There are
NO
fluids in the
operator that can leak out.
Chain
Stop
Ceiling
Chain Idler
Wheels
Operator
Bottom
Top View
Chain Setup
A filler post or barrier may need to be
installed between the gate and wall area
(See page 2 for more information).
Sweeps
Concrete
Pad
Primary
Operator
Position
Secondary
Operator
Position
Elbow
NO
Sweep
YES
DoorKing’s Primary/Secondary Interconnection Cable (Dual Operator Application Only)
(Secondary Power and Communication wires)
Loop Lead-In Wires (Low Voltage wire insulation)
AC Input Power (High Voltage wire insulation)
AC Input Power (High Voltage wire insulation)
3/4 Inch Conduit Recommended
•
The conduit requirements are for a typical slide gate operator installation (the secondary operator is shown for those
applications where a secondary operator may be used).
The conduit requirements for your application may vary from
this depending on your specific needs.
•
Use only sweeps for conduit bends. Do not use 90° elbows as this will make wire pulls very
difficult and can cause damage to wire insulation. DoorKing recommends using 3/4-inch conduit.
•
Installation of
External Entrapment Protection Devices
are
REQUIRED
(photo sensors and/or reversing edges).
•
Be sure that all conduits are installed in accordance with local codes.
•
Never
run low voltage rated wire insulation in the same conduit as high voltage rated wire insulation.
External Safety Devices, Controls and P.A.M.S. Wires (Low Voltage wire insulation)
Summary of Contents for 9150-080