Air-conditioner and Heater
BF-18
Construction of the Heater
1.Left air pipe
2.Wind channel ass'y
3.Middle air pipe
4.Right air pipe ass'y
5.Left door defroster hose ass'y
6.Defroster nozzle ass'y
7.Right door defroster hose ass'y
8.Wind inlet channel ass'y
9.Plastic nut ass'y
10.Heater ass'y
11.Air blower ass'y
12.Heater control ass'y
13.Water inlet tube
Summary of Contents for DFA1101GZ5AD6J-907
Page 1: ...DFA1101GZ5AD6J 907 SERVICE MANUAL DONGFENG AUTOMOBILE CO LTD 2006 05 ...
Page 24: ...Clutch CL 8 ...
Page 34: ...Transmission MT 9 16 Lift the countershaft out by using crane or hoist Transmission mainshaft ...
Page 63: ...Transmission MT 38 ...
Page 123: ...Brake System BR 12 ...
Page 131: ...Cab BF 7 Cab External Trims ...
Page 133: ...Cab BF 9 Front and rear window Cab door seal strip ...
Page 134: ...Cab BF 10 Door outside molding Foot step shield and mat ...
Page 149: ...Air conditioner and Heater BF 25 Schematic Circuit of Air condition System ...
Page 150: ...Air conditioner and Heater BF 26 ...
Page 165: ...Electric and Instrument EL 14 Electric wiring diagram ...