9. Match-drill four holes in the machine center for securing the legs.
10.
Open the collector’s access door and remove the filter cartridge, filter retention mechanism, and the first-stage filter.
11.
Position the inlet collar on the machine center and trace the inlet opening and bolt pattern. Remove inlet collar, cut inlet hole,
and drill bolt holes using a 3/16-in diameter drill bit.
12.
Apply a 1/4-in diameter bead of sealant to the machine center, toward the outside edge of the bolt pattern.
13.
Align collar and fasten to machine center using 1/8-in customer-supplied bolts, washers, and hex nuts.
14. Fasten the isolators to the machine center.
15. Lift collector into position over the vibration isolators and lower slowly. Fasten using the supplied hardware.
16.
Connect the flexible duct using the supplied hose clamps.
Inlet Hopper with Vibration Isolators
leg
sealant
hopper
vibration
isolator
flex-duct collar
hose clamp
hose clamp
bolt hole
flex-duct
inlet collar
Sealant Detail
see sealant detail
see sealant
detail
Dryflo, MMA and MMB
22