Fusion Hybrid Gas Condens
Fusion Hybrid Gas Condens
Fusion Hybrid Gas Condens
Fusion Hybrid Gas Condens
26
26
26
26
installation.
- The gas installation pipes must be made of suitable materials and comply with the applicable
legislation to this respect (RIGLO).
- The gas connection must be made using a rigid pipe, inserting a shut-off valve between the
boiler and the pressure regulator.
-
All the pipes must be suitably fixed in place.
WARN
WARN
WARN
WARNING
ING
ING
ING
If a gas type other than the one specified on the boiler reference plate is used, it could cause fire
or even explosion.
Make sure that the gas supply is suitable for the type and capacity of the boiler.
The boiler must be left running for 10 minutes before checking the gas pressure, to obtain
thermal equilibrium.
If the boiler is used with propane, a gas regulator suitable for this type of gas must be installed.
The connection and installation must be made in accordance with the applicable regulations and
standards at the time of installation (RIGLO).
DANGER
DANGER
DANGER
DANGER
Check the seal and draining of the entire installation, as a gas leak could cause serious damage
and/or death.
If a propane-fired boiler is installed in an interior room or compartment underground, one side
of the building must be open to the exterior.
If a gas tank is used, it must be installed in a cool, shaded place away from direct sunlight. It must
also be thoroughly secured to prevent it from tipping over, which could cause an explosion.
Keep all doors and windows closed while you are bleeding the gas pipes and put out all
cigarettes, flames or any possible source of ignition.
T
TT
The
he
he
he outpu
outpu
outpu
output pr
t pr
t pr
t pressure
essure
essure
essure of the pres
of the pres
of the pres
of the pressure reg
sure reg
sure reg
sure regulator
ulator
ulator
ulator must be in ac
must be in ac
must be in ac
must be in accordance with Standard EN
cordance with Standard EN
cordance with Standard EN
cordance with Standard EN
43
43
43
437
77
7
....