26
Installing the ventilation system
8.4
3. Insert the ventilation
grilles.
5. Insert winter cover.
2. Insert the frame and
screw into position.
4. Lock the ventilation
grilles.
1. Seal the mounting frame, making it waterproof.
To install the ventilation grilles, cut two rectangles (451mm x 341mm) in the outer wall
of the vehicle (for position of the cuts, see point 6.3).
L 500
For installing the Truma-roof flue outlet a round cut-out with a diameter of 65mm is fixed onto the
vehicle roof. The roof flue outlet gets screwed in the roof cut-out.
Truma - roof flue outlet AK3
L 500
L 500
Truma- roof flue outlet
AK3
Truma roof flue outlet
AK3
Truma Art.Nummer :
30700-03
Truma pipe
Truma Art.Nummer :
39450-00
The flexible high-grade steel
flue outlet tube is pushed
into the roof flue outlet as
well as put unto the mouth of
the gas exit and fixed with a
worm clamp or the screws,
supplied by Truma.
The gas routing has to be
mounted constantly ascen-
ding.
A
The minimal installation height of the flue outlet tube, between the upper edge of the appliance
and the gas exit at the flue outlet may not be below 250mm. Maximally 1500mm are possible.
A distance of at least 50mm to surrounding walls and furniture has to be kept.