38
11.1 Operator settings
Adjustment to the operator should be carried out in accordance with the operator manufacturers manual.
Please note that our hardware kits have been CE approved for use with the operators specified in our ITT report and enclosure B. Should a differ
-
ent operator be chosen, then the installer must carry out a peak force analysis in accordance with EN 12445 and EN 12453.
12 Disassembly
The door should be disassembled in the reverse sequence to the assembly manual.
12.1 Disposal
All parts of this garage door can be easily disposed of.
Please consult your local authorities on this matter
13 Maintenance
In accordance with EU standards, sectional overhead doors should be checked, from the first time of use, based on the indicated service by the
installer.
This inspection service has to be recorded written.
This inspection service should be carried out by an approved installer cq company.
Directly after installing:
1) lubricate the tracks (advice: PTFE spray)
By Installer
2) lubricate bearings, and rollers (advice: PTFE spray)
By Installer
3) lubricate pins of the hinges from intermediate- and side-hinges (advice: PTFE spray)
By Installer
4) lubricate sealing rubbers (advice: special rubber grease or talcum powder
By Installer
After 3 months:
1) Re-tensioning springs ( relaxation springs)
By Installer
2) visual inspection
By Installer
Every 6 months or every 750 door cycles:
1) remove debris from the door and surroundings
By: user
2.lubricate the tracks (advice: PTFE spray)
By: user
3.lubricate bearings, shafts and rollers (advice PTFE spray)
By: user
4.lubricate pins of the hinges from intermediate- and side-hinges (advice: PTFE spray)
By: user
5.lubricate sealing rubbers (advice: special rubber grease or talcum powder)
By: user
6.clean the panels (advice: shampoo for car cleaning with water), do not use aggressive detergents
By: user
7.wax the panels (advice: car wax)
By: user
Every 12 months or every 1500 door cycles :
1) check the cables, the end connections from the cable drums and bottom brackets on wear or damages
By Installer
2.check the spring break devices in accordance with separate manual
By Installer
3.check the balance of the door
By Installer
4.check the pulley (if present) for wear or damages
By Installer
5.check the rollers for wear and damages
By Installer
6.check the closing forces of the main closing edge
By Installer
7.check the suspension from the horizontal track to the ceiling
By Installer
8.check the weather strips for wear or damages
By Installer
9.check the bottom seal for wear or damages
By Installer
10.check the rubber seals on the top panel for wear of damage
By Installer
11.check the shaft coupler (if present)
By Installer
12.lubricate the torsion springs
By Installer
Summary of Contents for SRR-70
Page 1: ...Installation Manual SRR 70 ...
Page 6: ...6 ...
Page 7: ...44000 xxxx 44010 xxxx 24740 xxxx Alt 225010 xxxx 7 ...
Page 8: ...8 ...
Page 9: ...44012 pr 9 ...
Page 10: ...43001 xxxx 43011 xxxx 10 ...
Page 11: ...11 ...
Page 12: ...24619 pr 12 ...
Page 13: ...13 ...
Page 14: ...14 ...
Page 15: ...24803 24801 15 ...
Page 16: ...16 ...
Page 17: ...17 ...
Page 19: ...19 ...
Page 20: ...13026 27 13023 25047 20 ...
Page 21: ...21 ...
Page 22: ...13024 22 ...
Page 23: ...25630 25110 x 3mm 25111 x 4mm 25008 25010 E 25051 25052 25056 25057 23 ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 27: ...25003 25003 pr 27 ...
Page 28: ...28 ...
Page 29: ...29 ...
Page 30: ...30 ...
Page 31: ...31 ...
Page 32: ...32 ...
Page 34: ...25325 80301 DE EN NL FR 80302 SP IT PL CZ 34 ...
Page 35: ...35 ...
Page 36: ...36 ...
Page 39: ...For your Residential and Industrial door solutions www doco international com 39 ...
Page 40: ......