16
BA FlexxPump 125 - 24 V_20181121_EN de 201811
Operation
5.3 Menu Structure
The fi gure below shows the complete menu structure of the FlexxPump 125.
Action by user, LED fl ashes red
once
FlexxPump 125 is ready for
operation but not switched on
Sequence / reaction in the menu
FlexxPump 125 is in operation
LED in LCD fl ashes green
FlexxPump 125 is waiting
for a signal from the external
controller
LED in LCD fl ashes red
Perform single manual dosing
Display in the LCD fl ashes 2x
Programming
Firmware information
Expert menu
Programming (Standard menu)
Expert menu
MAX
1
MAX
1
MAX
2
MAX
1
MAX
2
MAX
1
3x
7x
Summary of Contents for 125
Page 2: ......
Page 5: ...BA FlexxPump 125 24 V_20181121_EN de 201811 5 ...
Page 37: ...BA FlexxPump 125 24 V_20181121_EN de 201811 37 Declaration of Conformity Notes ...
Page 38: ...38 BA FlexxPump 125 24 V_20181121_EN de 201811 Declaration of Conformity Notes ...
Page 39: ...BA FlexxPump 125 24 V_20181121_EN de 201811 39 ...