BA FlexxPump 125 - 24 V_20181121_EN de 201811 11
Installation and Commissioning
4. Installation and Commissioning
1. Unscrew the cartridge cap.
2. Screw the cartridge onto the Flexx-
Pump 125
3. Mount the FlexxPump 125 in the
desired position (see 3.3 Technical
Data for assembly data).
4. Connect the controller cable.
SET
A
A
B
B
5. Hold the magnetic pin
against the area of activity
A) Until "On" appears.
6. Remove the magnetic pin (B).
SET
A
B
7x
A
B
40x
1 MAX
7. Hold the magnetic pin against the
area of activity unitl "FIL" appears.
Ventings starts
8. Remove the magnetic pin (B) and put
it back into the holder
Summary of Contents for 125
Page 2: ......
Page 5: ...BA FlexxPump 125 24 V_20181121_EN de 201811 5 ...
Page 37: ...BA FlexxPump 125 24 V_20181121_EN de 201811 37 Declaration of Conformity Notes ...
Page 38: ...38 BA FlexxPump 125 24 V_20181121_EN de 201811 Declaration of Conformity Notes ...
Page 39: ...BA FlexxPump 125 24 V_20181121_EN de 201811 39 ...