Transport - 36
SK500 Operator’s Manual
Haul
CMW
Load
1.
Start engine.
2.
Slow engine to low throttle.
3.
Pull lift arm control to raise mount plate (and attachment) clear of trailer, but keep it low.
4.
Move unit to rear of trailer and align with ramps.
5.
Move both track drive controls forward and slowly move unit onto trailer until tiedown position is
reached.
6.
Push lift arm control to lower mount plate (and
attachment) to trailer bed.
7.
Turn ignition switch off.
8.
Close fuel shutoff valve (shown).
9.
Tie down unit.
Crushing weight. If load falls or moves it could kill or crush you. Use
proper procedures and equipment or stay away.
NOTICE:
•
Load and unload trailer on level ground.
•
Incorrect loading can cause trailer swaying.
•
Attach trailer to vehicle before loading or unloading.
•
Ten to fifteen percent of total vehicle weight (equipment plus trailer) must be on tongue to help
prevent trailer sway.
NOTICE:
If loading onto tilt-bed trailer, be prepared for trailer to tilt.
t05om02
9
c.eps
Summary of Contents for SK500
Page 1: ...SK500 Operator s Manual 054 091 Issue 2 0 CMW...
Page 9: ...Contents 8 SK500 Operator s Manual CMW...
Page 33: ...Drive 32 SK500 Operator s Manual Shut Down CMW...
Page 65: ...Service 64 SK500 Operator s Manual 500 Hour CMW...
Page 72: ......
Page 73: ......
Page 74: ...SK500 Operator s Manual Service Record 73 CMW Service Record Service Performed Date Hours...
Page 75: ...Service Record 74 SK500 Operator s Manual CMW Service Performed Date Hours...