JT520 Operator’s Manual
Systems and Equipment - 109
Drill Pipe
CMW
Drill Pipe
Perform Regular Drill Pipe Care
Precondition New Pipe
Repeat this procedure
three times
for each piece of pipe before it is used the first time:
1.
Hand-lubricate
entire surface of threads and shoulders of both ends of pipe with copper base tool
joint compound. See page 120 for correct lubricant.
2.
Join pipe and tighten joint.
3.
Break joint.
4.
Move pipe back to box.
Lubricate Joints Before Each Use
Lubricate threads and shoulders of male joints with copper base tool joint compound. This prevents rust
and reduces wear on shoulders and threads. See page 120 for correct lubricant.
Clean the Threads
Clean the threads as needed with high-pressure water and detergent.
NOTICE:
Failure to follow this procedure could result in fused joints. Pipe will be damaged or destroyed.
NOTICE:
Do not use gasoline or other petroleum-based solvents. This prevents tool joint compound
from sticking to the joints and will reduce thread life.
Summary of Contents for JT520
Page 1: ...JT520 Issue 1 1 Operator s Manual CMW 053 1219...
Page 59: ...Prepare 58 JT520 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 63: ...Drive 62 JT520 Operator s Manual Shut Down Unit CMW...
Page 71: ...Transport 70 JT520 Operator s Manual Tow CMW...
Page 113: ...Systems and Equipment 112 JT520 Operator s Manual Drill Pipe CMW...
Page 117: ...Complete the Job 116 JT520 Operator s Manual Stow Tools CMW...
Page 141: ...Service 140 JT520 Operator s Manual As Needed CMW...
Page 145: ...Specifications 144 JT520 Operator s Manual CMW...
Page 148: ......
Page 149: ......
Page 150: ...JT520 Operator s Manual Service Record 149 CMW Service Record Service Performed Date Hours...
Page 151: ...CMW Service Record 150 JT520 Operator s Manual Service Performed Date Hours...