Controls - 32
JT520 Operator’s Manual
ESID
CMW
6.
OK indicator
Green light means system
self test detected no
problems.
Strike system is ready to
operate.
7.
Electrical power supply
indicator
Green light means control
box has sufficient electrical
power for operation.
Strike system is ready to
operate if OK indicator is also
on.
8.
Self test button
To start manual self test,
press.
To reset system after a strike
has been detected, press.
Checks all systems and circuits.
NOTICE:
Item
Description
Notes
Summary of Contents for JT520
Page 1: ...JT520 Issue 1 1 Operator s Manual CMW 053 1219...
Page 59: ...Prepare 58 JT520 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 63: ...Drive 62 JT520 Operator s Manual Shut Down Unit CMW...
Page 71: ...Transport 70 JT520 Operator s Manual Tow CMW...
Page 113: ...Systems and Equipment 112 JT520 Operator s Manual Drill Pipe CMW...
Page 117: ...Complete the Job 116 JT520 Operator s Manual Stow Tools CMW...
Page 141: ...Service 140 JT520 Operator s Manual As Needed CMW...
Page 145: ...Specifications 144 JT520 Operator s Manual CMW...
Page 148: ......
Page 149: ......
Page 150: ...JT520 Operator s Manual Service Record 149 CMW Service Record Service Performed Date Hours...
Page 151: ...CMW Service Record 150 JT520 Operator s Manual Service Performed Date Hours...