JT520 Operator’s Manual
Systems and Equipment - 89
Electric Strike System
CMW
Assemble Voltage Detector
1.
Drive voltage stake into ground at least 6’ (2 m)
away from any part of system.
2.
Clip voltage limiter to voltage stake.
Test Strike System
If system fails any part of this test, see “Troubleshoot Strike System” on page 90 on the following page. Do
not drill until test is completed successfully.
1.
Turn on drilling unit.
2.
ESID control module will perform internal tests which check everything but alarms and strobe.
3.
If green OK indicator and electrical power supply indicator lights remain on, press self test button to
perform total test of strike system. During this test:
•
All lights should glow.
•
Alphanumeric readout should display numbers.
•
Alarms and strobes on all connected units should sound.
4.
If this test is successful, OK indicator and electrical power supply indicator lights will remain on.
5.
Use Electric Strike Simulator to test voltage and current sensors. See page 92.
Summary of Contents for JT520
Page 1: ...JT520 Issue 1 1 Operator s Manual CMW 053 1219...
Page 59: ...Prepare 58 JT520 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 63: ...Drive 62 JT520 Operator s Manual Shut Down Unit CMW...
Page 71: ...Transport 70 JT520 Operator s Manual Tow CMW...
Page 113: ...Systems and Equipment 112 JT520 Operator s Manual Drill Pipe CMW...
Page 117: ...Complete the Job 116 JT520 Operator s Manual Stow Tools CMW...
Page 141: ...Service 140 JT520 Operator s Manual As Needed CMW...
Page 145: ...Specifications 144 JT520 Operator s Manual CMW...
Page 148: ......
Page 149: ......
Page 150: ...JT520 Operator s Manual Service Record 149 CMW Service Record Service Performed Date Hours...
Page 151: ...CMW Service Record 150 JT520 Operator s Manual Service Performed Date Hours...