db CodeLock
Version 1.3
Digitus Biometrics, Inc. 2017
Page 5 of 10
Mount the tie-down pads to the Door and Cabinet – Step 2
The ties down pads are used to secure the supplied cable that connects the lock directly to the Remote Node / db
Sentry or ACM panel.
Ensure that the door surface is clean and free from any debris. (Using neat alcohol to clean the surface is highly
recommended. Allow drying time before proceeding.)
Figure 2
Remove the protective cover from each tie-down pad and situate as shown in Figure 2.