CompuLan Center dba/Digital IDView Technologies
12000 Ford Road, Suite 110
, Dallas TX 75234
3
-After opening the cover you should check for obvious damage as well as checking to ensure that the front
panel, data cable, power cord, and motherboard connections are not loose.
2.2 Hard Disk Installation
-For the first use please install the hard disk. This unit can install two hard disks with no limited capacity.
①
disassemble the screw
②
disassemble the cover
③
fix the screw of the hard disk
④
fix the screw of the hard disk
⑤
connect the data wire
⑥
connect the power wire
⑦
cover the machine
⑧
fix the cover
2.3 Shelf Installation
-This product has a chassis specification for the standard 1u so it can be installed in the standard shelf.
-Installation steps and attention items:
1. Make sure that the temperature in the room is lower than 35
℃
(95°f).
2. Ensure that the equipment has at least 15cm (6 inches) of space around it for proper air circulation.
3. From bottom to shelf installation.
4. When multiple components are installed in the frame please take preventive measures to avoid a
power circuit overload.
2.4 The Front Panel of the 411Z-960H Series