
DECconcentrator 500 Installation
3–7
3.2.3
Installing the Concentrator in a Rack
To install the concentrator in a rack, do the following:
1. With one person supporting the front of the unit, slide the unit into the rack
from the front of the cabinet (see Figure 3–4). Make sure that the I/O panel is
visible to monitor the LEDs.
2. Fasten the rackmount brackets to the U-nuts on the cabinet rails. Use the four
10–32 Phillips-head screws with lock washers provided in the rackmount kit.
3. Do not connect any cables until instructed to do so.
Figure 3–4:
Installing the Unit in the Rack
Front of cabinet
LKG–3807–91l
(4) 10-32
Phillips-head screws
with (4) lock washers
Summary of Contents for DECconcentrator 500
Page 2: ...Order Number EK DEFCN IN 004 DECconcentrator TM 500 TM Installation...
Page 58: ...Using Out of Band Management 4 13 Example 4 9 Displaying Show Line Characteristics Cont...
Page 60: ...Using Out of Band Management 4 15 Example 4 11 Displaying Show Line Counters Cont...
Page 98: ...Printed in U S A...