28
PM-000145 - PD/SD HIGH POWERED PLANETARY DRIVE MANUAL - MARCH 2019
9 OPERATING INSTRUCTIONS - RYNO HITCH
OPTIONAL EXTRA - RYNO HITCH
If you have purchased a Ryno Hitch please ensure you read and understand
the following operational procedures
AVOID PILE
INSTALLATION
WHEN HITCH IS
FULLY UP
AVOID PILE
INSTALLATION
WHEN HITCH IS
FULLY DOWN
The drive unit must
hang free when drilling.
Ryno Cradle Hitch is
designed to handle
the torsional loads
of anchors and
screw piling.
The rear cradle stops the
auger drive and anchors swinging around
while manoeuvring over uneven terrain. The
rear cradle must not be used as a strong
back support when drilling or applying
screw piles.
The front cradle allows the operator to angle the
drive up to a 90 degree, for easy connection to
augers or anchors.
PILE LOADING
DURING PILE LOADING, MAKE SURE THAT THE
LINKAGE IS IN LINE WITH THE PILE BEFORE
STARTING THE CROWDING OR LIFTING ACTION.
FAILURE TO DO SO MAY LEAD TO DAMAGE.
O
ver
10
˚
Summary of Contents for PD 30 HP-7
Page 1: ...1 OPERATORS MANUAL PD SD SINGLE SPEED HIGH POWERED DRIVES PM 000145...
Page 2: ...2 PM 000145 PD SD HIGH POWERED PLANETARY DRIVE MANUAL MARCH 2019...
Page 42: ...42 PM 000145 PD SD HIGH POWERED PLANETARY DRIVE MANUAL MARCH 2019 NOTES...
Page 43: ...43 NOTES...
Page 44: ...44 PM 000145 PD SD HIGH POWERED PLANETARY DRIVE MANUAL MARCH 2019 PM 000145...