11
OPERATING THE PLANETARY DRIVE CONT....
•
Drill stem rotation must be stopped before adding or removing sections, or making adjustments to the drill stem or
sampling equipment.
•
Augers shall be cleaned only when the rotating mechanism is in neutral and the auger stopped; long-handled shovels
shall be used to move cuttings from the auger. Materials heavier than 10kgs must be moved mechanically or by
using at least two people.
•
Drilling operations must be stopped in the event of local thunderstorm, or lightning activity. During operation, weather
conditions shall be monitored: operations shall cease during electrical storms or when electrical storms are imminent.
•
Open bore holes must be capped and flagged.
STORAGE OF THE PLANETARY DRIVE
•
Seal hydraulic couplers from contaminants and secure all hydraulic hoses off the ground to help prevent damage.
•
Clean the unit thoroughly, removing all mud, dirt, and grease.
•
Inspect for visible signs of wear, breakage, or damage. Order any parts required and make the necessary repairs to
avoid delays upon removal from storage.
•
Check that drive unit motor and hoses are full of clean oil and planetary is full.
•
Coat liberally with grease the output shaft and collar, extension shaft and collar, and all connecting pins to prevent
rust and reduce wear.
•
Tighten loose nuts, capscrews and hydraulic connections.
•
Replace decals that are damaged or in unreadable condition.
•
Store unit in a dry and protected place. Leaving the unit outside will materially shorten its life.
WARNING
WARNING
5 SAFETY PRECAUTIONS - GENERAL INFORMATION
Summary of Contents for PD 30 HP-7
Page 1: ...1 OPERATORS MANUAL PD SD SINGLE SPEED HIGH POWERED DRIVES PM 000145...
Page 2: ...2 PM 000145 PD SD HIGH POWERED PLANETARY DRIVE MANUAL MARCH 2019...
Page 42: ...42 PM 000145 PD SD HIGH POWERED PLANETARY DRIVE MANUAL MARCH 2019 NOTES...
Page 43: ...43 NOTES...
Page 44: ...44 PM 000145 PD SD HIGH POWERED PLANETARY DRIVE MANUAL MARCH 2019 PM 000145...