INSTALLATION 11
INSTALLATION
Before shipping, the GAC 2100 is inspected and tested for mechanical and
electrical defects. After unpacking, visually inspect for possible damage that
may have occurred during transit. Save all packing materials until the
inspection is complete. If damage is found, immediately file a claim with the
carrier and notify your DICKEY-john representative.
CONNECTING AC POWER
1. Verify that the ON/OFF (I/O) switch is in the OFF (O) position and that
the shipping brace is in the OPERATE position.
2. Plug the line cord into the connector on the rear panel next to the ON/
OFF switch.
3. Plug the male end into an appropriate 3-wire (grounded) outlet.
The grounding pin on the line cord connects directly to the
GAC 2100 frame. When using an adapter with a grounding wire
ensure the grounding wire is connected properly to a good earth
ground to prevent a shock hazard.
Figure 6
Connecting Power
Verify Shipping
Brace Transport
Handle is in
Operate
position
Line
Cord
Connector
On/Off
Switch
Display
Contrast
Control
Fuse
Assembly